All the plumbing has been roughed in and there is a couple of things are of concern
1. The gas point is in the home theatre should be in the dinning room this should be easy to fix
2. The sewage pipes coming down from the main bathroom don't line up with the hole in the slab, the pipe comes down in the pantry but the pipe hole in the slab is the other side of the wall. This should be interesting in how they fix this. I spoke with SS and he was going to check it out and get back to me

The SS also told us that there was a delay in the delivery of the bricks, apparently Boral has only just done the production run and they are still waiting for the "selectors" to sort the bricks and then they will be delivered.